Crossbeam bits & pieces

Progress on the Starwind 860 prototype continues. It does seem, however, that I've fallen behind in posting updates about the boat.

The aft crossbeams are nearly done; they still need the fibreglass tape on their outer edges and a final fairing coat before painting.

The front crossbeams now have their upper mid-beam structure installed and are ready to be closed in. That task will probably take place tomorrow.

Back On Track

Our little hiatus is over. We're settled in, the essential work is done, and it's time to get back to the boat.

The next thing on the Starwind 860 build schedule is to finish up the crossbeams. Today, with perfect weather and (for the first time ever) plenty of space to work, we laminated the lower flanges of both forward beams.

Crossbeams Closed In

With the temperature now dropping below zero on a regular basis, temporary permission has been obtained to bring boat parts indoors for short periods so that the epoxy can fully cure. (In this weather, the resin will kick off and gel just fine, but the reaction slows down dramatically once it starts to solidify.

Crossbeams, little by little

Trimarans are finicky to build. There really aren't too many ways to simplify the highly loaded crossbeam structure, particularly when (as in our case) it has to be able to fold for trailering.

Our Starwind 860's aft crossbeams are now sitting partially assembled in the garage. The webs, the strut blocks and the centre blocks are in place, and it is now time to start closing them up.