Blogs

Crossbeams Closed In

With the temperature now dropping below zero on a regular basis, temporary permission has been obtained to bring boat parts indoors for short periods so that the epoxy can fully cure. (In this weather, the resin will kick off and gel just fine, but the reaction slows down dramatically once it starts to solidify.

Server outage and spam

We were offline for a few hours today. The site was being heavily hammered by spammers of various types, causing the load on the server to skyrocket, and our hosting provider temporarily suspended service in self-defence.

Most of the site is up and running again. Comments and the built-in search tool are, unfortunately, unavailable for the time being until we find a better way to block the spammers.

Crossbeams, little by little

Trimarans are finicky to build. There really aren't too many ways to simplify the highly loaded crossbeam structure, particularly when (as in our case) it has to be able to fold for trailering.

Our Starwind 860's aft crossbeams are now sitting partially assembled in the garage. The webs, the strut blocks and the centre blocks are in place, and it is now time to start closing them up.

Pages

Subscribe to RSS - blogs